Did you already know about the EPBD obligation from 2025?

The new EPBD (Energy Performance of Buildings Directive) legislation coming into force in 2025 will have a major impact on parking lots at businesses and stores. According to this European directive, all existing buildings with more than 20 parking spaces must be equipped with electric vehicle charging points. This legislation is an important step toward a more sustainable future, but it also raises many questions: what does this mean specifically for your parking lots, what do you need to do to comply? And who exactly can help you with that?

What fines are applied?

Enforcement of the obligation is done by the Flemish Energy and Climate Agency (VEKA). If it is determined that the obligations have not been met, VEKA can impose an administrative fine of:

  • 2,000 euros per missing electric vehicle charging point

 

What exactly does the EPBD legislation entail?

As of 2025, companies and Co-Owner Associations (VMEs) must ensure that there are at least 2 charging points available for every 20 parking spaces (see table below). In addition, all parking lots must be prepared for the future, meaning that infrastructure must be in place to easily install additional charging points later. This requires both technical studies and the installation of the necessary facilities.

For new construction, there will be stricter rules that if there are more than 2 parking spaces, a charging point must be provided for each space.

How can Stroohm help you?

At Stroohm, we understand that EPBD legislation presents challenges. We are ready to support you every step of the way:

Study and Advice: At Stroohm, we have a wide range of knowledge and expertise. Our team conducts a thorough analysis of your office or VME situation. We assess the current infrastructure and create a customized plan for compliance, including future-proofing the parking lot.

Installation: After the study is completed, we take care of the complete installation of the charging stations. Whether it’s a few charging stations or a complete charging plaza, we take care of everything and guarantee flawless implementation. At Stroohm, we also think about the future. The utilities for any future expansions will therefore also already be prepared and installed.

With our extensive knowledge and experience, we will not only help your organization meet EPBD requirements, but also ensure that you are ready for the future of electric driving. Want to learn more about how we can get your parking ready for 2025? Contact us today contact us, and we’ll be happy to help!

Hidden

Next Steps: Sync an Email Add-On

To get the most out of your form, we suggest that you sync this form with an email add-on. To learn more about your email add-on options, visit the following page (https://www.gravityforms.com/the-8-best-email-plugins-for-wordpress-in-2020/). Important: Delete this tip before you publish the form.
Name(Required)
Privacy(Required)
This field is for validation purposes and should be left unchanged.
Naam(Required)
Enter the employer's VAT number in the format: "BE 0123.456.789"
This field is for validation purposes and should be left unchanged.
scroll to top