General
- What is the difference between private, semi-public, and public charging?
- What needs to happen to my installation when I switch from single-phase to three-phase at home?
- How to choose a charging station?
- When will I be reimbursed for my charging costs by my employer (business reimbursement)?
- Why is my car not charging on solar only?
- What is the charging time of an electric vehicle?
- How does charging at a fast charging station (mode 4) work?
- When using dynamic load balancing on the main fuse, which phases are used?
- How do I activate the user ports (P1) of my digital meter?
- What is the Mode 3 protocol and how does it work?
- I'm leaving my employer. What are my options regarding the Stroohm charging point?
- What is the difference between a single-phase and 3-phase charging station?
- What is the charging speed of an electric car?
- What is the difference between kW and kWh?
- What is Load Balancing?
- Is a charging cable allowed to run over the sidewalk/pavement?
- The fuse often blows during charging. What is wrong?
- I'm going to build. What electrical provisions can I make already?
- Why do I need a charging station?
- Using and accessing the P1 port of the digital meter in Belgium
- Advantages of Electric Cars with Single-Phase and Three-Phase Connections in Flanders
- Should I register my charging station with my network operator?
- Bi-Directional Charging, What's It All About?
- Laadpunt Meldingsplicht in Vlaanderen, Wallonië en Brussel
- Why doesn't my car charge as fast as I expected?
- Which types of plugs are used for charging electric vehicles?
- What is 'roaming'?